Why the Audit Comes First
Czyste Powietrze (Clean Air) is Poland's national programme for replacing polluting heat sources and thermomodernising single-family homes. It is run by the National Fund for Environmental Protection and Water Management (NFOSiGW), and the regional voivodeship funds (WFOSiGW) take in and settle applications. The reformed edition opened on March 31, 2025, backed by PLN 10 billion in non-returnable grants from the Modernisation Fund.
The reform changed the programme in one clear way: it now measures the house before and after the work. Before anything is built or replaced, the applicant must commission a mandatory energy audit, with a document confirming it. After the work is finished, an energy performance certificate must confirm that the home's demand for heating energy has fallen. Both documents must be prepared by a person entered in the register of those authorised to issue certificates, kept by the Ministry of Development and Technology. The programme funds both documents together, up to PLN 1,600.
That order is the point of the reform. The audit decides what the grant pays for: the scope of the investment must match the audit, and the invoices must confirm it. Work that starts before a positive funding decision, or work outside the audit's scope, does not qualify. The audit is also what ties the highest funding tier to the home's actual energy need, not only to the household's income, because the highest tier is aimed at homes where heating demand is high.
Who It Is For
The programme is for individuals who own or co-own a single-family home, or a residential unit in a single-family building that has its own separate land register. Two hard conditions apply to every applicant: the ownership period must be at least three years, except in inheritance cases, and the building must have received its building permit by December 31, 2020.
Funding runs in three tiers, set by income:
- Basic level: up to 40 percent of net eligible costs (excluding VAT), for applicants whose annual income does not exceed PLN 135,000.
- Increased level: up to 70 percent of net eligible costs, for households with average monthly income up to PLN 2,250 per person, or PLN 3,150 in a single-person household. Annual business income of the applicant or their spouse may be at most forty times the minimum wage.
- Highest level: up to 100 percent of net eligible costs, for households with average monthly income up to PLN 1,300 per person in a multi-person household, or PLN 1,800 in a single-person household. People with an established right to one of four allowances - permanent, periodic, family, or special care allowance - can also qualify. Annual business income of the applicant or spouse may be at most twelve times the minimum wage.
The highest tier is aimed at people exposed to energy poverty: owners of buildings or units where the demand for usable energy for heating is above 140 kWh per square metre per year. That energy standard is what the audit measures, which is why the highest tier and the audit are linked.
The Five Steps to a Grant
The programme publishes a sequence. Follow it in order, and keep every invoice.
- Get the energy audit. Commission the mandatory audit and the document confirming it, from a person on the official register, before any work begins. Funding of up to PLN 1,600 covers the audit and the later certificate together.
- Apply for funding. Applications are submitted electronically. If you are seeking prefinancing or the highest funding level, you must apply with the help of an operator. For the increased level without prefinancing, operator help is optional. Otherwise applications go through gov.pl, the gmina office, or the relevant WFOSiGW. Help from an operator is free, and runs from the decision to invest through to settlement.
- Choose eligible materials and equipment. The grant covers replacing a non-class solid fuel boiler (a "kopciuch") with a new heat source, and thermomodernisation: insulating partitions, windows and doors, garage doors, and mechanical ventilation with heat recovery. If the new heat source is a heat pump, a gasification boiler, or a pellet boiler, the equipment must come from the ZUM list, the official list of green materials and equipment.
- Do the work after approval. Work can start only after a positive funding decision. The scope must match the audit and be confirmed by invoices. VAT is not an eligible cost, so the beneficiary always bears the VAT on the work. If an operator is helping, the operator monitors the work against the programme's guidelines.
- Get the certificate and claim payment. After the work, commission the energy performance certificate confirming the reduced demand for heating energy. Then apply to the WFOSiGW for payment of the grant, in full or as the final instalment. The grant is paid in full or in up to three instalments.
What the Grant Covers and What It Does Not
The grant covers two kinds of work: replacing an old solid fuel boiler that falls outside the emission classes with a new, efficient heat source, and thermomodernisation of the building envelope and ventilation. The official list names insulation of partitions, window and door joinery, garage doors, and mechanical ventilation with heat recovery. The programme also funds the mandatory audit and the final energy certificate, up to PLN 1,600 for both together.
Two limits matter when planning a budget. First, the programme sets maximum grant amounts for each type of eligible cost, including per-square-metre limits on insulation area, so a large house does not earn an unlimited amount even at the 100 percent tier. The exact caps sit in the programme's cost annex on the official site, so check the current annex before pricing a job. Second, VAT is never an eligible cost. Whatever the funding tier, the beneficiary pays the VAT on the work out of pocket, on top of any costs above the caps.
The ZUM list deserves a note of its own. For heat pumps, gasification boilers, and pellet boilers, the equipment must be on the list of green materials and equipment. The list is free to use and is meant to stop applicants buying equipment that later turns out to be ineligible, so check the model before signing a contract, not after.
Worked Example: What the Percentages Mean (Hypothetical)
The figures below are a labelled hypothetical illustration using only the published percentages above. They are not a quote, and a real home's grant depends on its audit, its income tier, the measures it qualifies for, and the work actually completed.
Take a hypothetical home with PLN 100,000 of net eligible costs, excluding VAT. At the basic tier, 40 percent of PLN 100,000 is PLN 40,000. At the increased tier, 70 percent is PLN 70,000. At the highest tier, 100 percent is PLN 100,000. The audit and the final certificate add up to PLN 1,600 of funding on top, since the programme funds both documents together. Prefinancing, where it applies, is an advance of up to 35 percent of costs, which on PLN 100,000 is PLN 35,000, paid to the contractor rather than to the applicant.
The VAT line is the part people miss. VAT is not an eligible cost at any tier, so on top of the grant arithmetic above, the beneficiary pays the VAT on the whole job. A household at the 100 percent tier still pays the VAT, and a household at the 40 percent tier pays the VAT plus 60 percent of the net costs. The point of the example is the structure: the tier decides the share, the audit decides the scope, and the caps in the cost annex decide the ceiling.
Prefinancing: the 35 Percent Advance
Applicants at the highest and increased funding levels can ask for prefinancing, an advance of up to 35 percent of the costs, before the work is done. To get it, the applicant submits the contracts with the contractors who will do the work, and the advance is paid onto the contractor's account, not the applicant's. Operator support is mandatory with this form of funding, and the operator follows the work through to settlement.
Prefinancing suits households that cannot fund the whole job up front and wait for reimbursement, which is exactly the situation the highest tier is aimed at. The trade-off is control: the advance goes to the contractor, the operator monitors the work, and the scope must still match the audit. Applicants who can fund the work themselves skip this step and claim the grant after completion, in full or in up to three instalments.
Where to Get Help
The programme runs a free infoline for applicants on 22 340 40 80, Monday to Friday, 8:00 to 16:00, for general information. Questions about a submitted application go directly to the relevant WFOSiGW. Gminas run consultation and information points where the gmina has signed an agreement with the WFOSiGW, and those points can explain the programme and the local route into it. Operators are the free, hands-on route: they help from the decision to invest through to settlement, and they are mandatory for prefinancing and the highest tier.
The programme warns applicants to choose a contractor carefully. Before signing, check that the contractor has the right experience and references, uses materials and equipment from the ZUM list where required, and does not pressure a signature at the first meeting or promise results the programme cannot guarantee. Checking opinions beforehand and talking to the operator or the gmina point first is the programme's own advice.
Related Programmes Elsewhere in Europe
Poland's programme is one national answer to the same problem every European country faces: old homes with old boilers. The European framework behind them is the EU Renovation Wave, which sets the direction but is not something a household applies to directly; households apply to national programmes like this one.
Germany runs its building efficiency funding through KfW's BEG programme, which also pairs grants with energy standards for the building. Italy's Superbonus and Ecobonus take a tax-credit route to the same end, paying back part of the cost through the tax system rather than as a grant. Denmark's Bygningspuljen is a closer cousin to Czyste Powietrze: a direct grant pool for energy renovation of homes. The administrators, amounts, and deadlines differ in every case, so compare the programme in your own country rather than assuming one country's rules carry over.
Frequently Asked Questions
Can I start work before applying? No. Work can start only after a positive funding decision, and the scope must match the energy audit. Work done before approval, or outside the audit's scope, does not qualify.
What income qualifies me for the 70 percent tier? Average monthly income up to PLN 2,250 per person in a multi-person household, or PLN 3,150 in a single-person household. Annual business income of the applicant or spouse may be at most forty times the minimum wage.
What qualifies me for the 100 percent tier? Average monthly income up to PLN 1,300 per person in a multi-person household, or PLN 1,800 in a single-person household, or an established right to one of four allowances: permanent, periodic, family, or special care allowance. The tier is aimed at energy-poor households, where heating demand is above 140 kWh per square metre per year.
Is VAT covered by the grant? No. VAT is not an eligible cost at any tier, so the beneficiary always bears the VAT on the work, on top of any costs above the programme's caps.
Can I get money before the work is done? Yes, through prefinancing: an advance of up to 35 percent of costs for the highest and increased tiers, paid to the contractor's account once the contractor agreements are submitted. Operator support is mandatory with prefinancing.
Does my new boiler have to be on a list? If the new heat source is a heat pump, a gasification boiler, or a pellet boiler, yes: the equipment must come from the ZUM list, the official list of green materials and equipment. Check the model before signing a contract.
Program details change - verify current rules on the official program page before applying.